Real Time Continuous Treated Sewerage Water Quality Monitoring Stations.

2MLD Ulsoor STP CHIKKABANAVARA 5 MLD KADUGODI 6 MLD STP HORAMAVU 20 MLD K AND C VALLEY 60 MLD NAGASANDRA 20 MLD RAJACANAL 40 MLD
Parameters 2026-06-19 01:15:00 2026-06-19 00:30:00 2026-06-19 00:45:00 2026-06-19 00:45:00 2026-06-19 01:15:00 2026-06-19 00:30:00 2026-06-04 11:30:00 Limit Unit
pH 7.51 7.27 7.17 7.59 7.57 7.38 7.41 6.5-9.0 pH
Temperature 26.10 25.40 30.10 28.40 27.70 30.40 28.70 24-27 °C
Ammonical Nitrogen 1.01 0.99 0.60 0.45 0.50 0.84 0.67 5 mg/l
Total Nitrogen 3.53 3.30 3.01 3.20 3.60 1.85 3.70 10 mg/l
COD 38.25 19.16 36.20 - 29.45 43.32 44.07 50 mg/l
BOD 6.47 1.37 5.84 - 9.55 8.83 2.00 10 mg/l
TSS 8.98 3.23 20.26 - 5.24 9.22 13.13 20 mg/l
Color 8.03 4.22 5.99 - 10.66 6.53 9.00 hu
Dissolved Oxygen 3.47 2.22 3.54 1.80 - 5.36 4.78 mg/l
Total Phosphorus - - - - - - - 0.5 to 0.9 mg/l
Outlet Flow - - - - - - - mg/l
Inlet Flow - - - - - - - mg/l
YELLAMALAPACHETTY 15 MLD BELLANDUR 90 MLD DODDABELE 20 MLD NAGASANDRA OLD 20 MLD 4MLD Cubbon Park TTP KADABEESANAHALLI 50 MLD STP Sarakki 5 MLD
Parameters 2026-06-19 00:55:30 2026-06-19 01:00:00 2026-06-19 00:00:00 2026-06-19 00:45:00 2026-06-19 01:00:00 2025-12-31 17:45:00 2026-06-19 01:15:00 Limit Unit
pH 7.60 7.00 7.81 9.31 6.96 7.81 7.90 6.5-9.0 pH
Temperature 28.10 27.60 26.10 21.20 - 27.08 28.50 24-27 °C
Ammonical Nitrogen 0.85 0.79 0.14 0.05 0.30 1.77 2.50 5 mg/l
Total Nitrogen 3.66 2.00 10.10 0.08 1.35 4.77 5.00 10 mg/l
COD 39.37 33.24 35.55 44.10 12.48 45.76 19.41 50 mg/l
BOD 8.44 6.65 9.79 8.75 1.26 10.41 4.43 10 mg/l
TSS 5.91 8.31 12.13 11.85 0.62 12.08 5.36 20 mg/l
Color 5.34 6.98 9.44 8.55 2.75 7.80 3.88 hu
Dissolved Oxygen 3.94 3.42 25.00 124.00 10.94 3.64 - mg/l
Total Phosphorus - - - - - - - 0.5 to 0.9 mg/l
Outlet Flow - - - - - - - mg/l
Inlet Flow - - - - - - - mg/l
Mailasandra STP 75 MLD 60 MLD V.Valley TTP KR Puram STP 20 MLD 1.5 MLD Lalbagh TTP 35MLD Agaram STP Chikka_Bagur_5_MLD_STP Yelahanka 10MLD TTP
Parameters 2026-06-19 01:15:00 2023-12-05 15:45:00 2025-02-11 14:38:30 2026-06-18 22:00:00 2026-06-19 01:15:00 2026-06-19 01:15:00 2026-06-17 01:30:00 Limit Unit
pH 7.13 6.87 7.20 7.53 7.40 4.40 7.55 6.5-9.0 pH
Temperature 25.82 23.10 24.90 25.10 26.00 25.50 76.90 24-27 °C
Ammonical Nitrogen 3.47 0.86 2.40 0.49 0.88 3.75 0.32 5 mg/l
Total Nitrogen 7.23 2.06 4.80 2.50 3.61 6.00 0.79 10 mg/l
COD 49.54 20.00 48.90 27.04 30.34 41.10 -29.30 50 mg/l
BOD 8.35 1.75 7.56 2.37 5.18 8.90 4.00 10 mg/l
TSS 17.75 3.18 15.88 1.60 4.84 11.20 5.40 20 mg/l
Color 7.30 4.55 6.85 5.41 6.66 17.80 -6.26 hu
Dissolved Oxygen 2.95 1.53 2.58 4.14 - - 0.82 mg/l
Total Phosphorus - - - - - - 0.22 0.5 to 0.9 mg/l
Outlet Flow - - - - - - - mg/l
Inlet Flow - - - - - - - mg/l
40MLD OLD Rajacanal STP Hennur 1MLD TTP 4_MLD_Madiwala_STP 150MLD STP_K&C valley 20Mld KR Puram STP New 10 MLD STP HULIMAVU 40MLD Doddabele STP
Parameters 2026-06-19 01:00:00 2025-10-10 14:51:00 2026-06-19 01:15:00 2026-06-19 01:00:00 2026-06-19 01:00:00 2026-06-19 01:15:00 2026-06-19 01:00:00 Limit Unit
pH 7.33 7.39 7.37 7.38 8.29 8.08 6.59 6.5-9.0 pH
Temperature 25.60 26.40 26.30 - - - 28.66 24-27 °C
Ammonical Nitrogen 1.32 0.54 7.64 1.20 3.67 1.19 2.52 5 mg/l
Total Nitrogen 3.83 2.16 22.16 7.78 5.75 1.62 6.88 10 mg/l
COD 12.30 20.60 36.81 - 38.84 13.77 28.69 50 mg/l
BOD 7.50 2.10 8.37 6.52 5.97 0.82 7.70 10 mg/l
TSS 14.90 3.10 6.44 5.00 6.81 2.89 6.55 20 mg/l
Color 3.05 5.03 9.20 - 3.52 1.20 5.29 hu
Dissolved Oxygen 3.66 4.87 - - - - 3.50 mg/l
Total Phosphorus 0.66 0.11 - 0.60 - - - 0.5 to 0.9 mg/l
Outlet Flow - - - - 1.59 0.00 - mg/l
Inlet Flow - - - - 0.00 0.00 - mg/l

Flow Parameter Stations

  None KR PURAM 20 MLD - OUTLET 1.5MLD Lalbagh TTP Outlet To Horticulture 4MLD Cubbon Park TTP Outlet Overflow
  2025-04-21 09:17:17 2023-09-14 16:42:00 2026-06-19 01:15:00 2026-04-30 06:45:00
  0.57 MLD 21.60 MLD 0.37 MLD 0.46 MLD

Flow Parameter Stations

  6 MLD Kadugodi 20MLD Nagasandra STP 20 MLD Doddabelle 15MLD Yellamalapachetty STP 5 MLD Chikabanavara 40 MLD Raja Canal 20 MLD Horamvu Agara 60 MLD KC Valley Hennur 1MLD TTP 4_MLD_Madiwala_STP
  2020-11-19 10:00:00 2020-11-19 10:00:00 2020-11-19 10:00:00 2020-11-19 10:00:00 2020-11-19 10:00:00 2020-11-19 10:00:00 2020-11-19 10:00:00 2020-11-19 10:00:00 2025-10-10 14:51:00 2026-06-19 01:15:00
 Inlet 28.75 MLD 0.07 MLD 0.18 MLD 0.04 MLD 35.47 MLD 37.50 MLD 0.19 MLD 72.26 MLD - -
 Outlet 25.73 MLD 0.03 MLD 0.16 MLD 0.03 MLD 26.06 MLD - 0.16 MLD 52.91 MLD - -
Powered By:  ©Aaxis Nano Technologies Pvt. Ltd.
Designed By: 